[1]
S. . Dangade, S. Shiyekar, and A. . Patil, “Dynamic Scheduling For Short-Life Span Construction Projects In Indian Smes: A Simulation-Based Study”, J Neonatal Surg, vol. 14, no. 32S, pp. 9692–9708, Nov. 2025.